Tanzania, Uganda, Burundi and Rwanda have reached a formal agreement to construct a multi-billion dollar railway network, which would also serve South Sudan and tap into the bloc’s growing trade. The project, to commence in 2014, is expected to take three years and cost $4.7 billion. This will run alonsgside the $3 billion Tanga-Arusha-Musoma-Kampala railway line that is expected to be completed by 2015.
Tanzania and Uganda signed an agreement with China Civil Engineering Construction Corporation to undertake a feasibility study and implementation of the project, which will be the main gateway of Mwambani Port in Tanga, Musoma dock and Port Bell in Uganda. “We are expecting to handover the feasibility study by April while construction of the 880km railway line is expected to be completed by 2015.” the Chinese engineering firm managing director Wang Xiangdong said,
Mr Xiangdong said the railway line will be constructed to the 1,435mm, which is the standard gauge used in other countries and directed by both states.
-
determinesek6 liked this
-
forexcash168 liked this
-
zachisweird reblogged this from prepaidafrica
-
crochetadventures liked this
-
prepaidafrica posted this